Project

TenneT – 380-kV Neubau - CCM – PFA 4

In the first field between the portal and mast 1, the railroad line 1502 Oldenburg - Osnabrück is crossed. The 110 kV line shown in the plans is part of the conversion work on the new Cappeln West substation. Whether or not it will cross the 380 kV line depends on technical and construction agreements. The work in this interface area must be fixed within the framework of construction meetings with all those involved. 

Between pylons 32 and 33, the 110 kV line LH-14-088 Löningen - Essen of Avacon Netz GmbH and the railroad line Meppen - Essen (Oldb.) of Emsländische Eisenbahn (EEB) will be crossed. 
No temporary solutions are planned for either crossing with the overhead lines. According to the state of the art, the existing 110 kV overhead lines and the railroad lines have to be protected alternatively.

Project key figures

Project Area

Overhead Power Lines Germany


Project Start

02.2023


Project End

10.2026


Client

TenneT TSO GmbH


Indicators

49pcs 380 kV new poles
Line length of 19km
Foundations with 196 piles
Pole erection with 3700to.
Light road construction with 5000m
Heavy road construction with 160.000m²
Working areas with 130.000m²

Contact

Detlev Ewering