A celebration of the completion of the Koralmbahn took place in December. In this project, EUROPTEN took over the electrification of the tunnel system and the construction of the overhead line system for the access routes on both the Styrian and Carinthian sides and was of course present at the celebrations.
An insight into this outstanding project can be found here: >>>