110-kV overhead line Steyr Nord – Steyr Ost
The area close to Steyr is one of the most important industrial locations in Upper Austria. The city of Steyr and the industry located there are supplied by the three substations Steyr Fischhub, Steyr Ost and Steyr Nord.
The 110-kV overhead line now affected by the maintenance measures was built in 1940/41. In the following years, the majority of the existing masts were replaced.
EUROPTEN has now also renovated the last ten supporting masts from the years it was built.
Project key figures
Project AreaFreileitung Österreich
Project Start
03.2024
Project End
06.2024
Client
Energie AG Oberösterreich Tech Services GmbH
Indicators
• Standortgleicher Ersatzneubau von 10 Tragmaste
• Trassenlänge: 2,271 km