Project

SBB Winterthur Töss – Embrach

SBB is upgrading Embrach-Rorbas / Pfungen station to be step-free so that it meets the requirements of the Disability Equality Act (BehiG). At the same time, the overhead contact line system is being renewed. We are rebuilding the catenary system on the Pfungen to Embrach line and at Embrach station and demolishing the old catenary system with our 2-way vehicles.

Project key figures

Project Area

Catenary Systems AT/CH/SI


Project Start

05.2023


Project End

08.2023


Client

SBB AG, Infrastruktur Zürich


Contact

Werner Schwendimann

Managing Director