Project

SOB Steinerberg

Steinerberg station does not yet meet the requirements of the Disability Equality Act (BehiG). Passengers currently have to cross a track to get to the center platform. The railroad technology has also reached the end of its service life. The SOB is renewing the technical installations at the same time as the main work on the tracks and the platform.

  • Adaptation of the railroad access to comply with BehiG requirements
  • Construction of passenger underpass (PU)
  • Optimization of the railroad technology
  • Renewal of the track
  • Renewal of the overhead contact line system

Project key figures

Project Area

Catenary Systems AT/CH/SI


Project Start

02.2023


Project End

10.2023


Client

SOB AG, Herisau