CATENARY SYSTEMS AT/CH/SI

VIENNA INZERSDORF TERMINAL

In the course of the concentration of intermodal goods traffic in and around Vienna a multifunctional cargo terminal was built in Inzersdorf at the interface between the Pottendorfer rail line and the S1 highway. The cargo centre was planned for wagonload traffic, combined traffic (combined cargo transport terminal) and contract logistics and provides all necessary infrastructural and operational facilities.
The Austrian Federal Railways commissioned us to construct the catenary system. Construction works for the catenary system of type 1.1 and 1.3 with a length of more than 27 kilometres started in February 2015 and concluded by the end of September 2018.

  1. START
    February 2015
  1. END
    September 2018
  1. CLIENT

    ÖBB Infrastruktur AG
  1. KEY FIGURES

    New construction section:
    23.2 km 1.1 type catenary
    3.4 km 1.3 type catenary
    10km line feeders and ground wires
    269 poles

    Reconstruction section:
    Adaptation of 6 km of existing catenary

 

European Trans Energy GmbH